Skip to content
PREKTAL
Stormwater drainage tunnel
IndexProjectsLisbon Drainage Tunnels (PGDL)Portugal
Water & Wastewater5 km · Tunnel length

Lisbon Drainage Tunnels (PGDL)

Two major stormwater tunnels (5 km total) for flood protection and climate resilience.

SectorWater
LocationLisbon
CountryPortugal
StatusDelivered
Tunnel length5 km
Scope4 packages
01
Overview

Lisbon Drainage Tunnels (PGDL)

Construction of two major stormwater tunnels (Monsanto–Sta. Apolónia and Chelas–Beato), 5 km in length. Delivered by Município de Lisboa with Mota-Engil / SPIE Batignolles International on a design-and-build contract. Enhances flood protection and climate resilience in Lisbon. Compliant with EU tunnelling and water-industry standards.

02 — Scope

Packages delivered.

SCOPE / 01

Tunnelling works — excavation, segmental lining, shafts, chambers

SCOPE / 02

Civil engineering — site structures, foundations, basins

SCOPE / 03

M&E — pumping stations, cabling, automation systems

SCOPE / 04

Associated site infrastructure

03 — Engineering

Schematic
cross-section.

A — A SECTIONSCALE 1:200TUNNEL LENGTH · 5 kmPortugal

Indicative engineering schematic — detailed drawings available on request.

07 — Let's build

Let'sbuild somethingbetter.

Tell us about your project. Our team will get back to you within one business day — or skip the form and call us directly.

Prektal · Engineering · Contracting · Foreign TradeEst. 2008 · HQ Türkiye · Branches Basra & London